3-2. FLARE CONNECTION
1) Cut the copper pipe as straight as possible with a pipe cutter. (Fig. 1, 2)
2) Remove all burrs from the cut section of the pipe, ensuring that precautions are taken to
avoid getting metal shavings into the piping. (Fig. 3)
5HPRYHÀDUHQXWVDWWDFKHGWRLQGRRUDQGRXWGRRUXQLWVWKHQSXWWKHPRQSLSH
4) Flaring work (Fig. 4, 5). Firmly hold copper pipe in the dimension shown in the table.
Select A mm from the table according to the tool you use.
5) Check
 &RPSDUHWKHÀDUHGZRUNZLWK)LJ
 ,IÀDUHLVGHIHFWLYHFXWRIIWKHVHFWLRQDQGUHSHDWSURFHGXUH
3-3. PIPE CONNECTION
 )DVWHQÀDUHQXWZLWKDWRUTXHZUHQFKDVVSHFL¿HGLQWKHWDEOHDERYH
 :KHQIDVWHQHGWRRWLJKWÀDUHQXWPD\HYHQWXDOO\EUHDNDQGFDXVHUHIULJHUDQWOHDNDJH
Indoor unit connection
Connect both liquid and gas piping to indoor unit.
Apply a thin coat of refrigerant oil (J) on the seat surface of pipe.
 7RFRQQHFW¿UVWDOLJQWKHFHQWHUWKHQWLJKWHQWKH¿UVWWRWXUQVRIÀDUHQXW
Use tightening torque table above as a guideline for indoor unit side joints, and tighten
XVLQJWZRZUHQFKHV([FHVVLYHWLJKWHQLQJGDPDJHVWKHÀDUHVHFWLRQ
Outdoor unit connection
Connect pipes to stop valve pipe joint of the outdoor unit following the same procedure
detailed in Indoor unit connection.
For tightening, use a torque wrench or spanner.
3-4. INSULATION AND TAPING
1) Cover piping joints with pipe cover.
2) For outdoor unit side, insulate the piping, including valves.
3) Apply piping tape (G) starting from the connection on the outdoor unit.
When piping has to be installed through a ceiling, closet or where the temperature
DQGKXPLGLW\DUHKLJKXVHDGGLWLRQDO¿HOGVXSSOLHGLQVXODWLRQWRSUHYHQWFRQGHQVD-
tion.
Copper
pipe
Good
Tilted
No good
Fig. 1 Fig. 2
Burr
Copper pipe
Spare reamer
Pipe cutter
Fig. 4
Fig. 3
Smooth all around
Even length
all around
Inside is shin-
ing without any
scratches.
Fig. 5
Fig. 6
Flare nut
Die
Copper pipe
Clutch type
Flaring tool
Wing nut type
Pipe diameter
inch (mm)
Nut
inch
(mm)
A inch (mm) Tightening torque
Clutch
type tool
for R410A
Clutch
type tool
for R22
Wing nut
type tool
for R22
N•m
ft•lb
(kgf•cm)
ø 1/4 (6.35)
1/4
(17)
0 to 0.02
(0 to 0.5)
0.04 to
0.06
(1.0 to
1.5)
0.06 to
0.08
(1.5 to
2.0)
13.7 to
17.7
10 to 13
(140 to
180)
ø 3/8 (9.52)
3/8
(22)
34.3 to
41.2
25 to 30
(350 to
420)
ø 1/2 (12.7)
1/2
(26)
0.08 to
0.10
(2.0 to
2.5)
49.0 to
56.4
36 to 42
(500 to
575)
ø 5/8 (15.88)
5/8
(29)
73.5 to
78.4
54 to 58
(750 to
800)
4-1. PURGING PROCEDURES AND LEAK TEST
1) Remove service port cap of stop valve on the side of the outdoor unit gas pipe.
2) Connect gauge manifold valve and vacuum pump to service port of stop valve on the
gas pipe side of the outdoor unit.
3) Run the vacuum pump 15 minutes or more.
4) Check the vacuum with the gauge manifold valve, then close it and shut off the vacuum
pump.
5) Leave as it is for one or two minutes. Make sure pointer gauge manifold valve remains
LQ WKH VDPH SRVLWLRQ &RQ¿UP WKDW SUHVVXUH JDXJH VKRZV ± 03D >*DXJH@ ±
LQ+J>±PP+J@
6) Quickly remove gauge manifold valve from service port of stop valve.
7) After refrigerant pipes are connected and evacuated, fully open all stop valves on both
sides of gas pipe and liquid pipe. Operating the unit without fully opening the valves
lowers the performance and causes problems.
8) Refer to 1-3. SPECIFICATIONS, and charge the prescribed amount of refrigerant if
needed. Be sure to charge slowly with liquid refrigerant. Otherwise, composition of the
refrigerant in the system may be changed and affect performance of the air conditioner.
9) Tighten cap of service port.
10) Conduct a leak test
Stop valve for
GAS
Stop valve cap
(Torque 19.6 to
29.4 N•m, 200
WRNJIƒFP
Vacuum pump (or the vacuum
pump with the function to
SUHYHQWWKHEDFNÀRZ
Gauge manifold valve
(for R410A)
Compound pressure gauge
(for R410A)
±03D
±LQ+J
>±PP+J@
Handle
Low
Handle High
Adapter for pre-
venting the back
ÀRZ
Charge hose
(for R410A)
*Close
*Open
Hexagonal wrench
Precautions when using the control valve
When attaching the control valve
to the service port, valve core may
deform or loosen if excess pressure
is applied. This may cause gas leak.
Service port
Charge hose
Body
Close
Open
Control valve
A
When attaching the control valve to
the service port, make sure that the
valve core is in closed position, and
then tighten part A. Do not tighten
part A or turn the body when valve
core is in open position.
Service port cap
(Torque 13.7 to
17.7 N•m, 140 to
180 kgf•cm)
*4 to 5 turns
Stop valve
for LIQUID
4. PURGING PROCEDURES, LEAK TEST, AND TEST RUN
Pressure gauge
(for R410A)
Uneven Burred